TB 9-2330-376-14
14. Receipts/Verification Contractor Repairs. When
a. Storage. Not applicable.
supplies are submitted for contractor repair, the repair
b. Shipment. See paragraph 6b of this
bulletin.
activity shall:
c. Handling. Not applicable.
a. Provide contractor with point of contact.
18. Referenced Documents.
b. Obtain location, name and telephone number of
DA Form 2402. Exchange Tag.
contractor representative for any required follow-up pur-
DA Form 2407, 2407-1, and DA Form 5504, 5504-1:
poses.
Maintenance Request (Claims) and Continuation
15. Claim Denial/Disputes. All denials or disputes will
Sheets.
be handled by TACOM. Unit may be held responsible for
DA PAM 738-750. The Army Maintenance Manage-
submission of non-valid warranty claims.
ment System (TAMMS).
16. Reporting. Reporting or recording action on a failed
DD Form 250. Material inspection and Receiving Re-
item shall be as specified in DA PAM 738-750. Contrac-
port.
tor unique forms shall not be used.
AR 700-139. Army Warranty Program, Concepts and
Policies.
17. Storage/Shipment/Handling.
4