TB 10-3510-220-24
non-contractor repair only after
(1.) False Returns. Government
negotiation and settlement with the
units returning items to the
c o n t r a c t o r concerning the scope of
c o n t r a c t o r for repair which are
r e p a i r s to be performed by Army
f o u n d to be serviceable will be
personnel.
penalized for the cost, loss of time,
Army repair of hardware shall proceed
nonavailability of items or other
only upon reciept of written
restrictions. False returns will be
instructions from the contractor and
monitored by TROSCOM.
appropriate WARCO.
(2.) Receipts/verification
of
e. Claim Denials/Disputes. Claim
contractor repairs.
d e n i a l s / d i s p u t e s will be addressed
through the WARCO and by
c. Special Area Requirements. If an
item or component is located in the
d i s p u t e arises, s e t t l e m e n t will be
continental United States (CONUS),
e s t a b l i s h e d by negotiation between
t h e item will be returned to the
TROSCOM and the Contracts
destination identified for that
department of Engineered Air
component or to Seller's plant,
Systems, Inc.
w h i c h e v e r is advantageous to the
Government. In the event components
are located outside CONUS, the
f. Reporting. Reporting or recording
appropriate WARCO listed in
action on a failed item shall be as
specified in DA Pam 738-750 or DA
disposition instructions.
Pam 738-751.
d. Reimbursement for Army
Repair. The Army shall proceed with
6