TB 11-5825-291-30
cannot be resolved locally, the WARCO will contact the major subordinate command
representative. If a resolution cannot be obtained at this level, the WARCO will then
raise the issue to a Defense Contract Management Administration Office (DCMAO)
representative at the manufacturer's facility.
7.4. Reporting
Reporting or recording action on a failed item will be as specified in DA PAM 738-750.
Contractor unique forms will not be used.
8. STORAGE/SHIPMENT/HANDLING
The following ensures proper storage, shipment, and handling of warrantied equipment:
a. Storage
All warrantied items will be marked in accordance with MIL-STD-129J, Marking for
Shipment and Storage, and MIL-STD-130F, Identification Marking of U.S. Military
Property. Packaging and preservation considerations for the warrantied items will follow
the instructions and procedures outlined in MIL-STD-794 and MIL-E-55585.
b. Shipment
Procedures for shipment of warrantied items will be in accordance with AR 70-47,
Engineering for Transportability, and will include the special provisions outlined in this
section.
1. The government is entitled to compensation of reasonable costs incurred
while shipping warrantied items from and/or to the responsible contractor or designated
facility. Refer to section 4 for further information on the contractor's assumption of
shipping cost.
2. Procedures for the recovery of shipping and transportation costs are listed in
c. Handling
All warrantied items will be marked in accordance with MIL-STD-129 and MIL-STD-130.
Current government standards for handling will be followed for all warrantied items.
Packing and preservation considerations for the warrantied items will be in accordance
with the instructions and procedures outlined in MIL-STD-794 and MIL-E-55595.
12