ARMY TB 9-6115-671-24
c.
Repair Notification. Upon notification of repair or replacement by the contractor, the CECOM WARCO will advise
the claimant activity that the item has been repaired or replaced and the claim shall be considered closed upon receipt
and satisfactory inspection of the repaired/replaced item.
d. Receipts of Contractor Repaired/Replaced Items. Upon receipt of the repaired components, the Warranty claimant
activity will inspect the returned item and its accompanying documentation and verify that the warranty repair has
been satisfactorily performed. If the repair is unsatisfactory, the activity should notify the CECOM WARCO and the
claim shall be reopened.
5