TB 11-5841-305-23
GENERAL.
The CV-3338B/ASN-128D Signal Data Converter (SDC), NSN 5895-01-518-8783, procured
under LRIP contract # DAAB07-01-C-B014, and the SDC including Shop Replaceable
Assemblies (SRAs), hereafter referred to as the SDC and SRAs, procured under the full rate
production contract with solicitation number W15P7T-05-R-A004, are under warranty for a
period of five (5) years. The SRAs consist of the Doppler Module Assembly, the GPS Module
Assembly and the Power Supply Assembly. The warranty period begins when the SDCs or
SRAs are shipped out of BAE Systems in Wayne, NJ. The warranty period ends exactly five
years after the initial warranty date.
EXPLANATION OF TERMS.
The following definitions are applicable to this WTB:
a) Abuse. The improper use, repair, or handling of warranted items such that the
warranty may become void.
b) Acceptance Date. The date an item of equipment is accepted into the Army's inventory
by the execution of the acceptance block and signing of a DD Form 250 or approved
acceptance document by an authorized representative of the Government.
c) Alterations/Modifications. Any alteration after production such as retrofit, conversion,
remanufacture, design change, engineering change and the like.
d) Consolidated Warranty Technical Bulletin. A WTB that covers a multiple number of
equipment or systems.
e) Contractor Support. Those services that are to be performed and those
responsibilities that are placed upon the contractor by the Government as specified in
the warranty contract/provisions. This support, which may include such things as labor,
parts, tools, training, technical packages, etc., will be used in support of the warranted
equipment during the specified warranty period.
f)
Correction.
Elimination of a
defect and restoration of
the equipment to
required
operational status.
g) Defect. Any condition or characteristic in any supplies or services furnished by the
contractor under the contract that is not in compliance with the requirements of the
contract. Also a deficiency in or insufficiency of the system or its components to
perform in accordance with the requirements of the contract and/or to conform to the
requirements of the contract.
h) DCMA. Defense Contract Management Agency.