TB5-4930-237-23
9. Storage/Shipment/Handling.
a. Storage. Refer to TM5-4930-237-10 for details.
b. Shipment. The user will ship defective equipment to the contractor's plant using the following procedures. The
shipment must be approved by the TROSCOM WARCO and an authorization number assigned before the defective
equipment is shipped.
(1) Defective equipment will be packed in a sturdy fiberboard container with enough filler material to prevent
damage during shipment. The authorization number and Army forms must be included in the container.
(2) All shipments will be made to the contractor's plant in Kansas City, Kansas. Refer to Warranty Claims
Service Facility, paragraph 4.d., for the complete address.
(3) All shipments will be sent prepaid land freight. COD shipments will be returned to the sender unopened.
Refer to Reimbursement of Shipping Costs, paragraph 4.e., for details on recovery of shipping funds.
c. Handling. The equipment does not require any special handling.
7/(8Blank)